Our Projects

A portfolio of capital engineering and construction projects delivered across Africa.

Kenmare Development Projects (WCPA Upgrade Initiative) Mining

Kenmare Development Projects (WCPA Upgrade Initiative)

Moma Mine, Nampula Province, Mozambique
Oct 2024 – Mar 2026

WCPA and Early Works, Main Works for Nataka and Main Scope of Nataka Project. A SMPP FIDIC agreement for the provision and installation of a range of steel structures, including their mechanical parts, as well as HDPE and carbon steel piping.

View Project
SMO (Scavenger Mining Operation) — Mechanical & Piping Installation Mining

SMO (Scavenger Mining Operation) — Mechanical & Piping Installation

Moma Mine, Nampula Province, Mozambique
Apr 2024 – Jul 2025

Completion of the Scavenger Mining Operation (SMO) plant project, managing the supply chain for all necessary components. Scope included: manufacturing, delivering, assembling and testing two cutter suction dredgers (150 tph CSD 200) and one process water pump (Godwin CD250M); supply and installation of a screening module with feed bin, vibrating screen, transfer sump and pumps; and implementing two 150 tph spiral plants and overland piping per Kenmare's specifications.

View Project
Flotation & Filtration Upgrade - FIDIC Contract Mining

Flotation & Filtration Upgrade - FIDIC Contract

Moatize, Mozambique
Apr 2022 – Jan 2024

Oversaw the enhancement of flotation and filtration systems within mineral processing, significantly boosting overall efficiency and productivity. Delivered as an SMPP and E&I project under a FIDIC contract framework.

View Project
Kareevlei Diamond Mine Crushing & Screening Project — FIDIC Contract Mining

Kareevlei Diamond Mine Crushing & Screening Project — FIDIC Contract

Kareevlei Mine, South Africa
Jan 2022 – Oct 2022

Provided comprehensive services, including the supply and installation of a wet and dry crushing and screening facility, complete with a gravity diamond separator facility and all requisite infrastructure amenities.

View Project
HMU Trial - FIDIC Contract Mining

HMU Trial - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
Aug 2021 – Jun 2022

Conducted a trial for the Heavy Mineral Concentrate Unit, facilitating decision-making and strategy optimisation for downstream processing improvements.

View Project
Rotary Uninterruptible Power Supply (RUPS) - FIDIC Contract Power & Energy

Rotary Uninterruptible Power Supply (RUPS) - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
Jul 2021 – Jul 2022

Contributed to the enhancement of power infrastructure, installing a rotary uninterruptible power supply in line with contractual obligations.

View Project
Wet Concentrator Plant B Relocation - FIDIC Contract Mining

Wet Concentrator Plant B Relocation - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
Jun 2020 – Jan 2021

Successfully relocated the Wet Concentrator Plant (7,500 tons of plant) to a new site, 22 km overland.

View Project
Overland Raw Water & Slurry Pipeline - FIDIC Contract Infrastructure

Overland Raw Water & Slurry Pipeline - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
Mar 2020 – Jun 2021

Completed the construction of a 20 km overland pipeline designed for water and slurry transportation, adhering to contract specifications and industry standards.

View Project
Works Barge - FIDIC Contract Infrastructure

Works Barge - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
Jan 2019 – Dec 2019

Constructed a works barge for transportation purposes, delivering the project within the specified budget and contributing to the improvement of transportation infrastructure in line with Kenmare's operational needs.

View Project
Wet Concentrator Plant C - FIDIC Contract Mining

Wet Concentrator Plant C - FIDIC Contract

Moma Mine, Nampula Province, Mozambique
May 2018 – Mar 2019

Installed a new Wet Concentrator Plant, enhancing the plant's mineral extraction capabilities.

View Project
Wet Concentrator Plant B Upgrade (Phase 2 & 3) - NEC Contract Mining

Wet Concentrator Plant B Upgrade (Phase 2 & 3) - NEC Contract

Moma Mine, Nampula Province, Mozambique
Sep 2017 – Aug 2018

Upgraded the Wet Concentrator Plant for improved mineral processing in line with contractual obligations and industry standards.

View Project
Panda Hill - FIDIC Contract Mining

Panda Hill - FIDIC Contract

Mbeya Region, Tanzania
Jan 2017 – Sep 2017

Collaborated with Hatch on the construction of infrastructure for the Niobium Project. Developed project plans with clear objectives and resource allocation, ensured permit compliance and approvals, prepared management frameworks for contractors and established health and safety protocols. Implemented quality assurance, monitored budgets and developed risk management and sustainable practices. The project was halted at an early stage, just before mobilisation to site, due to political uncertainty in Tanzania.

View Project
Tailing Storage Facility - NEC Contract Mining

Tailing Storage Facility - NEC Contract

New Luika Gold Mine, Tanzania
Aug 2016 – Sep 2017

Constructed a tailing storage facility for the safe disposal of mining waste, ensuring compliance with contractual guidelines and environmental legislation.

View Project
Williamson Diamonds - FIDIC Contract Mining

Williamson Diamonds - FIDIC Contract

Mwadui Mine, Tanzania
Apr 2016 – Dec 2016

Constructed a high-rate thickener, improving the capabilities of the Diamond Processing Plant.

View Project
Underground Infrastructure Works - NEC Contract Mining

Underground Infrastructure Works - NEC Contract

New Luika Gold Mine, Tanzania
Mar 2016 – Jan 2017

Contributed to the improvement of mining operations through efficient underground infrastructure development.

View Project
1,800 ML Raw Water Dam - NEC Contract Infrastructure

1,800 ML Raw Water Dam - NEC Contract

New Luika Gold Mine, Tanzania
Jun 2015 – Dec 2016

Constructed a 1,800 ML raw water dam to ensure a continuous supply of water to mining operations.

View Project
Luika River Dam - NEC Contract Infrastructure

Luika River Dam - NEC Contract

New Luika Gold Mine, Tanzania
May 2015 – Sep 2016

Designed and constructed the Luika River Dam for sustainable water storage and management.

View Project
Haul Road Design & Construction - NEC Contract Infrastructure

Haul Road Design & Construction - NEC Contract

New Luika Gold Mine, Tanzania
Jan 2015 – Dec 2016

Designed and constructed haul roads, optimising logistics and transportation infrastructure to expedite mining operations.

View Project
Carbon-in-Leach (CIL) & Pre-Leach Upgrade - NEC Contract Mining

Carbon-in-Leach (CIL) & Pre-Leach Upgrade - NEC Contract

New Luika Gold Mine, Tanzania
Jan 2015 – Oct 2015

Upgraded the CIL and pre-leach systems for maximum gold extraction.

View Project
Crushing & Screening Plant (Sandvik) - NEC Contract Mining

Crushing & Screening Plant (Sandvik) - NEC Contract

New Luika Gold Mine, Tanzania
Apr 2014 – Feb 2015

Managed procurement, construction and commissioning of the Crushing and Screening Plant, maximising ore processing capabilities and operational efficiency.

View Project
150 ML Reservoir - NEC Contract Infrastructure

150 ML Reservoir - NEC Contract

New Luika Gold Mine, Tanzania
Jan 2014 – Jun 2014

Constructed a 150 ML reservoir, accommodation units, mine stores and infrastructure works to support mining operations.

View Project
Carbon Transfer Plant (FLSmidth) - Elution Plant - NEC Contract Mining

Carbon Transfer Plant (FLSmidth) - Elution Plant - NEC Contract

New Luika Gold Mine, Tanzania
Dec 2013 – Jun 2014

Procured, managed construction and commissioned the Carbon Transfer Plant for efficient gold processing.

View Project

Have a Project In Mind?

Let's discuss how Binvic can deliver your next capital project.