The company has been involved with the successful completion of the following projects for Shanta Gold, from concept, to feasibility, construction and commissioning:

  • Underground Mining Infrastructure Works: Civil Design and Construction; Structural Design, Supply and Construction; as well as the electrical and mechanical on all concrete and structural steel structures.
  • Design and construction of the 1800Ml Luika River Dam Wall (as client representative and contractor).
  • Camp upgrades to cater for the Underground Mine.
  • Mechanical installation of a 10 Mega Watt Power Plant.
  • Water Treatment Plant and Sewerage upgrades; and installation of the Water System to cater for 1200 persons.
  • Tailings Storage Facility – project management and contractor co-ordination
  • Construction and commissioning of the mine’s clinic.
  • Process Plant Upgrade including civils, structural, mechanical, platework (installation of 2 ML tank, electrical and commissioning.
  • Civil, mechanical, electrical, instrumentation and commissioning of the Elution and Carbon Transfer Plant (mechanical equipment supplied by FLSmidt and VIC).
  • Civil, mechanical, electrical, instrumentation and commissioning of 70 Ktph Sandvik Crushing Plant (equipment supplied by Sandvik).
  • Construction of a 40-man accommodation units.
  • Design, supply and construction of various structural steel buildings exceeding 150ton.
  • Design and construction of Jamhuri and Ilunga Haul Road.
  • Design and construction of complete mining infrastructure upgrade.
  • Carbon Transfer Plant (FLSmidth) – Elution Plant for Shanta Gold
  • Crushing and Screening Plant (SandVIk) – 150 tph for Shanta Gold
  • 150 ML reservoir, Accommodation Units, Mine Stores etc. for Shanta Gold
  • Luika River Dam – (Design BY SSZ) for Shanta Gold
  • Haul Road Design and Construct – BinVic for Shanta Gold
  • CIL and Pre-Leach Upgrade (DRA) for Shanta Gold
  • 1800ML Raw Water Dam for Shanta Gold
  • Underground Infrastructure Works for Mining for Shanta Gold
  • Tailing Storage Facility for Shanta Gold
  • Williamson Diamonds – Construction of 50m diameter high rate thickener.

Other projects include:

  • Installation of 50-high rate thickener in Mwanza with Petra Diamonds at the Williamson Diamond Mine
  • Civil, mechanical, electrical, instrumentation and commissioning of the Singida Gold Mine Pilot plant on the Panda Hill Tanzania Niobium Mine, in partnership with Hatch.

Contact Us

Tanzania

Tel: +255 22 219 8040
Fax: +255 22 219 8001
Email: info@binvic.com
Address:
1st Floor, Acacia Estate Offices
84 Kinondoni Road, Kinondoni,
Dar es Salaam,
Tanzania

South Africa

Tel: +27 11 759 4097
Fax: +27 11 759 4001
Email: info@binvic.com
Address:
4th Floor, The Firs
Cradock Avenue, Rosebank
Johannesburg
2000

Mozambique

Tel: +258 84 870 0636
Cell: +27 83 625 9871
Cell: +27 83 639 0244
Email: info@binvic.com
Address:
Rua Eusebio da Silva Ferreira Nr. 474
Matola A, Matola Cidade,
Maputo, Mozambique