The company has been involved with the successful completion of the following projects for Shanta Gold, from concept, to feasibility, construction and commissioning:
- Underground Mining Infrastructure Works: Civil Design and Construction; Structural Design, Supply and Construction; as well as the electrical and mechanical on all concrete and structural steel structures.
- Design and construction of the 1800Ml Luika River Dam Wall (as client representative and contractor).
- Camp upgrades to cater for the Underground Mine.
- Mechanical installation of a 10 Mega Watt Power Plant.
- Water Treatment Plant and Sewerage upgrades; and installation of the Water System to cater for 1200 persons.
- Tailings Storage Facility – project management and contractor co-ordination
- Construction and commissioning of the mine’s clinic.
- Process Plant Upgrade including civils, structural, mechanical, platework (installation of 2 ML tank, electrical and commissioning.
- Civil, mechanical, electrical, instrumentation and commissioning of the Elution and Carbon Transfer Plant (mechanical equipment supplied by FLSmidt and VIC).
- Civil, mechanical, electrical, instrumentation and commissioning of 70 Ktph Sandvik Crushing Plant (equipment supplied by Sandvik).
- Construction of a 40-man accommodation units.
- Design, supply and construction of various structural steel buildings exceeding 150ton.
- Design and construction of Jamhuri and Ilunga Haul Road.
- Design and construction of complete mining infrastructure upgrade.
- Carbon Transfer Plant (FLSmidth) – Elution Plant for Shanta Gold
- Crushing and Screening Plant (SandVIk) – 150 tph for Shanta Gold
- 150 ML reservoir, Accommodation Units, Mine Stores etc. for Shanta Gold
- Luika River Dam – (Design BY SSZ) for Shanta Gold
- Haul Road Design and Construct – BinVic for Shanta Gold
- CIL and Pre-Leach Upgrade (DRA) for Shanta Gold
- 1800ML Raw Water Dam for Shanta Gold
- Underground Infrastructure Works for Mining for Shanta Gold
- Tailing Storage Facility for Shanta Gold
- Williamson Diamonds – Construction of 50m diameter high rate thickener.
Other projects include:
- Installation of 50-high rate thickener in Mwanza with Petra Diamonds at the Williamson Diamond Mine
- Civil, mechanical, electrical, instrumentation and commissioning of the Singida Gold Mine Pilot plant on the Panda Hill Tanzania Niobium Mine, in partnership with Hatch.